You're under contract on a house in Orlando. The listing mentioned a "bonus room" that used to be a garage, a newer screened porch, maybe a water heater that looks suspiciously recent. The question nobody asked yet: was any of it permitted? In a market where buyers finally have time to check — and sellers can least afford a surprise at the closing table — permit history has become one of the most consequential and least examined pieces of a Central Florida deal. Here is how to pull it yourself, for free, and what the law actually says when something was built without one.
Why this matters more in this market than it did two years ago
The Orlando Regional REALTOR® Association's September 2026 report — which covers home sales by REALTORS® across Orange, Seminole, Osceola, Lake, and Volusia counties, not just the City of Orlando — puts the median sale price at $399,610, inventory at 12,464 homes, and closed sales at 2,325 for the month. Homes averaged 66 days on the market, and ORRA reports months of supply at 5.3 in its headline figures (a separate section of the same report says 5.6 — the association's own numbers are not perfectly consistent, which is worth knowing when you see either figure quoted). ORRA also cites a 7.4% average 30-year rate for September, per Freddie Mac.
"A 7.3% rate changes the math for a lot of families, and September's sales reflect that," said Chris Atwell, 2026 president of the Orlando Regional REALTOR® Association, in the report. (Yes — the quote says 7.3% while the report's own rate line says 7.4%. We quote him verbatim and flag the gap rather than smooth it over.)
What five-plus months of supply and 66 days on market mean in practice: buyers have time to run a permit search before writing an offer, and inspectors, lenders, and insurers have time to ask questions. An unpermitted addition that might have sailed through a 2021-style bidding war now gets noticed — and priced.
What actually requires a permit in Orange County
Less than many sellers fear, more than many homeowners assume. Orange County's Fast Track permitting FAQ says you generally do not need a permit for minor projects such as interior or exterior painting, replacing flooring, replacing cabinets or countertops in the same location without changing the layout, landscaping (not including irrigation systems), portable plug-in heating or cooling units, a satellite dish, or a flagpole up to 15 feet tall (20 feet if removable and sectional).
The county's same guidance is blunt about the rest: most construction, remodeling, electrical, plumbing, mechanical, and structural work does require a permit. That garage conversion, the enclosed porch, the new electrical panel, the re-roof — those are permit work. Note that this guidance comes from Orange County's building division; if the property sits inside the City of Orlando, Winter Park, or another municipality, that city's building department has its own rules and its own records.
How to pull a property's permit history yourself
This is the part most buyers never do, and it costs nothing.
Unincorporated Orange County: Orange County's guidance says to use Fast Track Online Services, click "Property (Address/Parcel)" in the sidebar, and search by address or parcel ID — past permit information for the property is displayed. For older work, the county keeps a separate historical permit search covering permits issued before June 4, 2012, searchable by address or parcel number. That date matters: a house remodeled in 2005 and a house remodeled in 2015 live in two different databases.
City of Orlando: The city publishes permit application data through its open data portal, where you can filter permit applications by type and date and export the results, and it runs a separate project lookup tool for checking the status of a specific permit. If something doesn't appear in the datasets, the city's page points you to a public records request.
Compare what you find against what you see. Four bedrooms in the listing but permits for three? A 2019 water heater with no plumbing or mechanical permit on file? That's not proof of a violation — records can be incomplete, and some work was exempt — but it is exactly the kind of gap to resolve before closing, not after. Our Orlando community guide and the rest of our 19 community guides note which areas fall under city versus county jurisdiction, which determines where you search — older in-town housing stock like College Park has simply had more decades to accumulate un-documented projects than a 2020s build.
When work was done without a permit: the two exits
Orange County's FAQ lays out what happens when a violation is issued for work completed without a required permit, and there are only two ways out: remove the unpermitted work, or apply to keep it by submitting plans showing it meets current code. Keeping it means approved plans, an issued permit, and completed inspections — and, in the county's own words, "in some cases, finished work may need to be uncovered so it can be inspected." Drywall comes off. Stucco gets opened. That is the real cost of legalizing after the fact, beyond the fees themselves (the county publishes building fees in its fee directory; most are scoped to the project, so there is no single flat number to quote).
Two more county rules worth knowing: an expired permit — one that was pulled but never closed out with final inspections — must be replaced with a new permit and the remaining inspections completed. And for storm-damaged or question-mark properties, the county offers a Field Investigation Report, where an inspector visits (for a fee) and specifies what permits are needed.
Who carries the risk — and what to negotiate
Florida law requires sellers to disclose known material defects that aren't readily observable to the buyer — and that duty applies even on an "as-is" contract. A seller who knows the sunroom was built without a permit should disclose it. Buyers, for their part, shouldn't rely on disclosure alone: the permit record is public, free, and takes only minutes to check.
If a search turns something up mid-transaction, the usual paths are: the seller legalizes the work before closing (slow, but clean), the price or a credit absorbs the buyer's cost and risk of doing it after closing, or — for work that can't reasonably be legalized — the structure comes out. Which path makes sense depends on the lender, the insurer, the scope of the work, and how the contract was written. None of this is one-size-fits-all, and we won't pretend otherwise.
Thinking of selling a home with a project in its past? It's far better to find the gap before your buyer's inspector does — start with an honest number from our home value tool, then pull your own permit history the same way a buyer would. And if you'd rather talk it through first, a conversation with Bethanne Baer, Broker/Owner of Bear Team Real Estate, is free — no commitment, just a straight answer about what the record shows and what to do about it.
This article is for general education and reflects market data published as of October 19, 2026, drawn from the sources linked above. Market conditions change, and figures are revised. Nothing here is financial, legal, tax, or lending advice, and no statement here is a recommendation to buy or sell. Equal Housing Opportunity.
Sources
Have a question this article didn’t answer?
Ask Scout™ anything, or send it to the team — a licensed Bear Team agent follows up fast.
Contacting Bear Team Real Estate, submitting a form, or requesting a consultation does not create a brokerage relationship. Brokerage relationships in Florida are established as provided under Chapter 475, Florida Statutes. Equal Housing Opportunity.